In many crushing methods, Impact Mill Machine for Sodium Gluconate has become one of the most mainstream pulverization techniques with a small particle size, narrow particle size distribution, high purity, high particulate activity, and good dispersibility. Especially suitable for crushing drugs such as contaminated materials.
Impact Mill Machine for Sodium Gluconate should be installed in a place where the site is flat.
Before working, it is necessary to pick up the processing material, no metal, stone, etc., the hard substances are mixed into the machine, so as not to damage the parts or failures in the machine. Check that each component is firm and reliable before booting. Everything is normal, the side can turn on the power, idle for 1-2 minutes, check whether the operation is normal, everything is normal, it can be pushed.
When operating, the operator cannot leave. Once the sound is abnormal, the power should be disconnected immediately.
When machining raw new friends Chinese medicine crusher, the discharge opening should be tied to the bag. When the pulverizer is in use, if you encounter the power supply voltage, do not use it, so as not to damage the motor. When the power supply voltage is normal, the machine is not easily damaged, and the production efficiency is high.
Technical parameters:
Finished particle size: D99.9: 180 mesh
Production capacity: 400kg
1. In the production process, the bearing temperature should be checked regularly. When the temperature rises above 50 degrees Celsius, the machine should be stopped to find the cause and troubleshoot.
2, when the new machine is running, the transmission belt is easily elongated. Pay attention to adjust the appropriate tightness of the belt to ensure the life of the belt.
3, which should be regularly inspected, replace it in time, ensuring production quality and production.
4, the wear of the blade and lining should be checked regularly. If the productivity is lowered after the wear, the grain size is thicker and the wear is immediately replaced.
5, host and grading flow bearing use grease lubrication.
6, bearingIf the replacement period is 2000 hours, the amount of the grease is fill the 1/2 or 3/4 (lower test) of the bearing cavity, and excessive grease cannot be filled, otherwise the temperature of the bearing will be too high.
7, the spiral feeder changes the fat period of 4,000 hours, plus ordinary calcium based grease.
8, in the output shaft E, i.e., pulley E, avoid heavy hush, damage to the part.
9. It is strictly forbidden to turn the handle of the handwheel in the stop.
10, the lubricator used by the governor adopts N32 alkaline high-zinc high anti-milling oil, and the reducer uses 401 universal lubricants and cannot be replaced by other machines.
11. After 3000 hours, the new oil should be replaced, and then used after 500 hours of oil for the second change, then use it after 1000 hours.
Shan Dong Alpa is a scientific and technological private enterprise producing various airflow pulverities, airflow mills, disc gap pulverities, disc air crushers.